Preparation of Report in Engineering field is very important to all Engineers in different sector.
Today i am going to Show you how to create a Snag report of any Project.Here i take a example of Hotel Project which i already engaged on this project.Its just for educational Purpose.
Phase 1 work Report as per Snag List (11/01/2018)
Villa-3 Snag list (10/30/2018)
Electrical:
1. Scratches/ colorless Power Socket / Switch need to Change near entrance.
Airtech have to Change it (As per Airtech Staff Don’t stock of 16 A
Socket)
2. Exhaust Fan not Working in Shower Room
Done
3. Wardrobe light is not working properly (Due to Adapter Damaged)
Done
4. 1- Concealed LED light missing @ center of the vanity counter @G Level
Done
5. TV outlet need to be replaced with internet outlet Socket (Need network
socket at TV socket).
No Material
6. External (Conduit) Cable Hiding near step light switch (Below the Entrance
Bridge)
It will be done while installation / erection of Landscaping light
Cable (Right now it is connected from villa DB) (These step lights will
be connected with External Landscaping light cable)
7. IT cable arrangement in router box cabinet @ Balcony
It will be done by IT Guys at the time of Dressing work( During
proper Connection of IT equipment )
8. Wall Bracket light @ Balcony (Missing)
Decision Pending
9. Angle Brass light @ ceiling of staircase (Missing)
We need proper Cut sheet to order it.
10. IP phone Details to Provide Vuko
It will be provided by IT Vender
11. 3- pin plug (16 A) (Power Socket) need to be install for Geyser
Done
12. Tear Drop Light proper Connection ( Due to short circuit of one Tear drop light-
Dinning Side
For Rectification need to small Cut in Ceiling ( Waiting for it)
Plumbing:
1. Insulation at hot water pipe.
Done
2. Behind the villa provision for the water supply of garden, proper
management with tap, connector
Valve is Already installed
Flexible pipe Need to be ordered
Mechanical
1. Split Indoor Ac Unit
Done
2. Split outdoor AC Unit
Need rubber pad / Vibrating pad with proper Stand.
3. AC piping outside
Exposed Ac Piping need to fix with Proper Clamp
Villa-4
Electrical
1. Concealed Light
Done
2. Round Bamboo Light
Done
3. Wardrobe light
Not Done (Led Strip light Chanel Requested)
4. Balcony Wall Bracket Light
Decision Pending
5.Step Lights Near Entrance Stair
Done (It will be conned later with Landscaping Circuit)
6.Switches, Sockets
Scratches & Colorless Switches & Sockets Airtech Have to change it.
(Need decision who will change this either client or Contractor if
client then need to order it)
Both side of Bed 2 -power socket are connected with UPS ( one
should be connected with DB circuit , Airtech have to change it .)
5. Telephone Outlet socket need to be replaced with Internet outlet
Material Need to be ordered
6. Electric Bell
Done (Later Louder one Chinese Bell Ding dong will install replace
with existing one)
7. Fire alarm System
Done
8. 3-pin top Plug installation for Geyser
NOT Done
9. Geyser
Done
Plumbing
1. Insulation on Hot water Pipe
Done
2. Behind the villa provision for the water supply of garden, proper
management with tap, connector
Not Done
Mechanical
4. Split Indoor Ac Unit
Done
5. Split outdoor AC Unit
Need rubber pad / Vibrating pad with proper Stand.
6. AC piping outside
Exposed Ac Piping need to fix with Proper Clamp
Villa-9
Electrical
1.Concealed Light
Done
2.Round Bamboo Light
Done
3.Wardrobe light
Not Done (Led Strip light Chanel Requested)
4.Balcony Wall Bracket Light
Decision Pending
5.Angle Brass Light near Staircase Ceiling @G level DB
Need Proper Cut for this to order this light
6.Step Lights Near Entrance Stair
Done (It will be conned later with Landscaping Circuit)
7.Switches, Sockets
Scratches & Colorless Switches & Sockets Airtech Have to change it.
(Need decision who will change this either client or Contractor if
client then need to order it)
8.Telephone Outlet socket need to be replaced with Internet outlet
Material Need to be ordered
9.Electric Bell
Done (Later Louder one Chinese Bell Ding dong will install replace
with existing one)
10.Fire alarm System
Done
11.3-pin top Plug installation for Geyser
NOT Done
12. Geyser
Done
Plumbing
1.Insulation on Hot water Pipe
Done
2.Behind the villa provision for the water supply of garden, proper
management with tap, connector
Not Done
Mechanical
1.Split Indoor Ac Unit
Done
2.Split outdoor AC Unit
Need rubber pad / Vibrating pad with proper Stand.
3.AC piping outside
Exposed Ac Piping need to fix with Proper Clamp
Villa-10
Electrical
1.Concealed Light
Done
2.Round Bamboo Light
Done
3.Wardrobe light
Not Done (Led Strip light Chanel Requested)
4.Balcony Wall Bracket Light
Decision Pending
5.Angle Brass Light near Staircase Ceiling @G level DB
Need Proper Cut for this to order this light
6.Step Lights Near Entrance Stair
Done (It will be conned later with Landscaping Circuit)
7.Switches, Sockets
Scratches & Colorless Switches & Sockets Airtech Have to change it.
(Need decision who will change this either client or Contractor if
client then need to order it)
8.Telephone Outlet socket need to be replaced with Internet outlet
Material Need to be ordered
9.Electric Bell
Done (Later Louder one Chinese Bell Ding dong will install replace
with existing one)
10.Fire alarm System
Done
11.3-pin top Plug installation for Geyser
NOT Done
12. Geyser
Done
Plumbing
1.Insulation on Hot water Pipe
Done
2.Behind the villa provision for the water supply of garden, proper
management with tap, connector
Not Done
Mechanical
7. Split Indoor Ac Unit
Done
8. Split outdoor AC Unit
Need rubber pad / Vibrating pad with proper Stand.
9. AC piping outside
Exposed Ac Piping need to fix with Proper Clamp
Villa-12
Electrical
1.Concealed Light
Done
2.Round Bamboo Light
Done
3.Wardrobe light
Not Done (Led Strip light Chanel Requested)
4.Balcony Wall Bracket Light
Decision Pending
5.Angle Brass Light near Staircase Ceiling @G level DB
Need Proper Cut for this to order this light
6.Step Lights Near Entrance Stair
Done (It will be conned later with Landscaping Circuit)
7.Switches, Sockets
Scratches & Colorless Switches & Sockets Airtech Have to change it.
(Need decision who will change this either client or Contractor if
client then need to order it)
8.Telephone Outlet socket need to be replaced with Internet outlet
Material Need to be ordered
9.Electric Bell
Not Done (we don’t have stock old one- Need Sample for Chinese
Bell Ding Dong Sample)
10.Fire alarm System
Done
11.3-pin top Plug installation for Geyser
NOT Done
12. Geyser
Done
Plumbing
1.Insulation on Hot water Pipe
Done
2.Behind the villa provision for the water supply of garden, proper
management with tap, connector
Not Done
Mechanical
1.Split Indoor Ac Unit
Done
2.Split outdoor AC Unit
Need rubber pad / Vibrating pad with proper Stand.
3.AC piping outside
Exposed Ac Piping need to fix with Proper Clamp
Villa-15
Electrical
1.Concealed Light
Done
2.Round Bamboo Light
Done
3.Wardrobe light
Not Done (Led Strip light Chanel Requested)
4.Balcony Wall Bracket Light
Decision Pending
5.Angle Brass Light near Staircase Ceiling @G level DB
Need Proper Cut for this to order this light
6.Step Lights Near Entrance Stair
Done (It will be conned later with Landscaping Circuit)
7.Switches, Sockets
Scratches & Colorless Switches & Sockets Airtech Have to change it.
(Need decision who will change this either client or Contractor if
client then need to order it)
8.Telephone Outlet socket need to be replaced with Internet outlet
Material Need to be ordered
9.Electric Bell
Not Done (we don’t have stock old one- Need Sample for Chinese
Bell Ding Dong Sample)
10.Fire alarm System
Done
11.3-pin top Plug installation for Geyser
NOT Done
12. Geyser
Done
Plumbing
1.Insulation on Hot water Pipe
Done
2.Behind the villa provision for the water supply of garden, proper
management with tap, connector
Not Done
Mechanical
1.Split Indoor Ac Unit
Done
2.Split outdoor AC Unit
Need rubber pad / Vibrating pad with proper Stand.
3.AC piping outside
Exposed Ac Piping need to fix with Proper Clamp
Villa-16
Electrical
1.Concealed Light
Done
2.Round Bamboo Light
Done
3.Wardrobe light
Not Done (Led Strip light Chanel Requested)
4.Balcony Wall Bracket Light
Decision Pending
5.Angle Brass Light near Staircase Ceiling @G level DB
Need Proper Cut for this to order this light
6.Step Lights Near Entrance Stair
Done (It will be conned later with Landscaping Circuit)
7.Switches, Sockets
Scratches & Colorless Switches & Sockets Airtech Have to change it.
(Need decision who will change this either client or Contractor if
client then need to order it)
8.Telephone Outlet socket need to be replaced with Internet outlet
Material Need to be ordered
9.Electric Bell
Not Done (we don’t have stock old one- Need Sample for Chinese
Bell Ding Dong Sample)
10.Fire alarm System
Done
11.3-pin top Plug installation for Geyser
Done
12. Geyser
Done
Plumbing
1.Insulation on Hot water Pipe
Done
2.Behind the villa provision for the water supply of garden, proper
management with tap, connector
Not Done
Mechanical
1.Split Indoor Ac Unit
Done
2.Split outdoor AC Unit
Need rubber pad / Vibrating